National Instruments Graphical User Interface Ultiboard Manual do Utilizador Página 69

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
  • Página
    / 281
  • Índice
  • MARCADORES
  • Avaliado. / 5. Com base em avaliações de clientes
Vista de página 68
Chapter 2 Beginning a Design
NI Ultiboard User Manual 2-4 ni.com
Complete the following steps to import a netlist file:
1. Select File»Import»UB Netlist, navigate to the desired file (for
example,
Getting Started 2.EWNET) and click Open. The Default
Trace Width and Clearance dialog box appears.
2. Enter the desired Units, Width, and Clearances values and click OK.
The Import Netlist Action Selection dialog box appears.
3. Select the desired actions, for example,
Add New Net: VCC and click
OK. A board outline is placed on the workspace with the parts ready
to be placed.
Working with Projects
Designs and projects appear in the Projects tab of the Design Toolbox.
To open a project or design shown in the Projects tab, click on it or
right-click on it and, from the context menu, choose Open Window.
To rename a design, right-click on it and, from the context menu, choose
Rename. You can then type a new name for the design.
To delete a design shown in the Projects tab, right-click on it and, from the
context menu, choose Remove Design. (To delete a project file, delete it
from its current location on the system.)
Vista de página 68
1 2 ... 64 65 66 67 68 69 70 71 72 73 74 ... 280 281

Comentários a estes Manuais

Sem comentários